Maintaining high equipment availability rates is crucial for any mine. For this reason, Codelco’s Division Andina, one of the most important mining sites in the region, needed to perform a crusher upgrade to their Symons crusher.
In order to achieve the needed increase in availability, the equipment’s setting time was reduced, as were its bowl removal time and its adjustment ring removal time. These various upgrades have reduced maintenance times and, with it, injury risk – and have led to increased uptime.
Upgrading crushers for higher uptime
Mining production rates have risen over the last few years, so it is necessary to maintain high equipment availability rates. In order to meet this challenge, it became important to upgrade the site’s crushers.
Division Andina, Codelco’s mining site in the mountain range of the Valparaiso Region, 80 km from Santiago, needed to increase its coefficient of performance in its tertiary and quaternary plants. Given this situation, there were two options: purchase new equipment or update the existing units.
The Symons 7’ crushers working at the client’s mining site belonged to the older generation of these machines, that is, machines installed prior to the 1980s. The main factors that affected the coefficient of performance of the mine’s ageing Symons 7’ crushers were:
This problem is common to all mining plants with older-generation equipment. In Chile, there are more than 100 such units operating in different mining plants.
Read the whole article: Availability increased by 31% with an upgrade to Symons crusher
Comments