The frame agreement is a continuation of Metso’s and Almalyk MMC’s contract signed at the end of 2022 for the design and basic engineering work for the copper smelter.
A mill lining should be optimized by design in order to minimize problems, utilize the mill’s capacity and keep a good liner profile throughout the wear life.