Work Location: Perth - Fortescue Centre
Roster: Part-time, 2.5 days per week
The Energy Operations Long-Term Maintenance Planner is responsible for long-term planning, maintaining master data, aligning minor and major shutdown schedules with business outages, and providing 2-year budgets and quarterly forecasts.
This position reports directly to the Lead Planner and collaborates closely with the planning team and site-based maintenance teams.
The Energy Operations team manages multiple generation and transmission network assets across the WA Pilbara operations. Solomon Power Station has a total output of 290MW which consists of, 2 x LM6000 turbines, 4 x Solar Titan turbines, and 14 x Bergen engines, all running on gas. At Chichester’s Power Station, there are 23 diesel gensets at Cloudbreak and 27 diesel genset at Christmas Creek, while near Iron Bridge, 118MW of solar panels are installed, with more assets expected to come online.