Cerro Lindo is an underground copper mine with an average daily production of 20,000 tons. The mine is located in central Peru, 175 kilometers southeast of the capital city of Lima, and operated by Nexa Resources.
The Tarkwa mine engineering management has been satisfied with the performance of the installed Metso valves as they have yielded step changes in their consistent reliability and the plant’s overall efficiency.
The Metso Wear Block™ materials include metal matrix composites, in which the erosion resistance approaches the performance of ceramic materials, while the mechanical and electrical characteristics are like metals.
After LKAB’s Malmberget iron ore mine installed Metso’s impact cradles and belt cleaners, the plant was able to extend belt life as well as significantly cut down on roller change-outs, reduce material spillage and improve safety.
Metso is expanding its digital Metso Metrics offering with the launch of a new predictive maintenance solution for mining equipment, aimed to help maximize the uptime and performance of comminution circuits.
Metso has won orders to deliver dewatering solutions to a customer developing greenfield and brownfield potash projects in Belarus. Metso's deliveries consist of inclined plate settler (IPS) units used for thickening in different applications. The orders are booked in Metso's third-quarter 2018 orders received.
Hundreds of technicians and tons of parts go into action in an instant as operations at Boliden Kevitsa Mining’s nickel mine in Sodankylä stop for the longest maintenance shutdown of the year.