Boyd, Roosen, Quartermain: It takes grit, invention, luck to make the big time
Mining industry legends discuss the backstories on their multibillion-dollar successes.
Wits Gold completed shallow underground mine design comprising a 700 metre vertical shaft for men and materials and a conveyor decline for rock transport. Based on indicated resources of 34.5Mt at 5.3g/t Au (5.9Moz), the same reefs host indicated resources of 17.0Mt at 0.16kg/t U3O8 (6.1Mlb)