True Gold Mining receives a bump after extending gold mineralization

West African junior True Gold Mining (CVE:TGM) extended gold mineralization at its Burkina Faso project announcing returns intercepts of 1.55 g/t Au over 54.9 metres & 2.39 g/t Au over 26.0 metres.

The company was up 6.15% to 34.5 cents a share as of 11:52 a.m. ET. The 52-week range is 21 cents to 46 cents.

The company said “. . . that its recently completed drill program extends gold mineralization an additional 2,000 metres from the northern edge of the currently defined Kao deposit at the Karma Gold Project (the “Karma Project”) in Burkina Faso, West Africa.

“This extension more than doubles the size of the gold footprint at Kao, expanding mineralization to a total strike length of 3,400 metres.”

Here is the full news release.

TrueGold Mining Inc : True Gold extends gold mineralization 2,000 metres north at Karma Project’s Kao deposit

20,000-metre drill program more than doubles strike length of mineralization, returns intercepts of 1.55 g/t Au over 54.9 metres & 2.39 g/t Au over 26.0 metres

VANCOUVER, B.C. – True Gold Mining Inc. (TSX-V; TGM) (“True Gold” or the “Company”) is pleased to announce that its recently completed drill program extends gold mineralization an additional 2,000 metres from the northern edge of the currently defined Kao deposit at the Karma Gold Project (the “Karma Project”) in Burkina Faso, West Africa. This extension more than doubles the size of the gold footprint at Kao, expanding mineralization to a total strike length of 3,400 metres.

Assay highlights from the core and reverse circulation (“RC”) drill program include:

  • 2.39 g/t gold (Au) over 26.00 metres in KAO13RC-482, including

o   4.14 g/t Au over 12.00 metres

  •  2.32 g/t Au over 18.00 metres in KAO13RC-468, including

o   13.60 g/t Au over 2.00 metres

  • 2.24 g/t Au over 30.00 metres in KAO13RC-470, including

o   18.35 g/t Au over 2.00 metres

  • 1.62 g/t Au over 33.95 metres in KAO13DD-221, including

o   4.13 g/t Au over 8.45 metres

  • 1.55 g/t Au over 54.90 metres in KAO13DD-222, including

o   2.18 g/t Au over 20.34 metres

  • 1.40 g/t Au over 46.50 metres in KAO13DD-223
  •  1.35 g/t Au over 76.50 metres in KAO13DD-204, including

o   4.30 g/t Au over 8.65 metres

  •  1.31 g/t Au over 63.53 metres in KAO13DD-211, including

o   2.09 g/t Au over 15.60 metres

  • 1.23 g/t Au over 44.00 metres in KAO13RC-473, including

o   2.03 g/t Au over 8.00 metres

“We are very impressed with the strike continuity, grades and widths that have been intersected in drilling north of the Kao deposit,” said Dwayne Melrose, President and CEO, True Gold. “Our exploration success clearly demonstrates the resource expansion potential at the Karma Project and validates the effectiveness of our targeted exploration approach. We remain committed to creating a flexible operation that can be scaled up through organic growth1.”

To review a drill map for the drilling north of Kao, please click on this link:
http://www.truegoldmining.com/sites/default/files/KaoDrillMap1336.pdf

For a full table of recent results related to gold mineralization north of Kao, please click on this link:
http://www.truegoldmining.com/sites/default/files/KaoDrillResults1336.pdf

In recent months, True Gold has prioritized expanding the footprint of the 1,400-metre by 900-metre Koa deposit, which hosts a 360,501-ounce Indicated resource averaging 0.897 g/t Au in 12.5 million tonnes of oxide material2. Recent drilling intersected shallow, east-dipping, intrusive-hosted gold mineralization, which is geologically consistent with the Kao deposit. Assays released today revealed that gold mineralization can be traced for 2,000 metres northeast of the Kao deposit, for total length of mineralization of 3,400 metres. Mineralization discovered on two drill fences near the northern limits of drilling, spaced 400 metres apart, included both near-surface oxide and sulphide gold. Mineralization remains open to the north, south, and west, and down-dip to the east.

The Company reported strong initial results from the drill program’s first 20 holes in June (including 1.01 g/t gold over 62.0 metres3) and announced an additional 30 holes in August4.

Metallurgical test results indicate strong, rapid recoveries for oxide material at the Kao deposit, with recoveries up to 97.4% of gold, most of it within 10 days5.

The 856-square-kilometre Karma Project includes five closely spaced deposits – Kao, Goulagou I, Goulagou II, Rambo, and Nami – with a proposed central processing facility. The Karma Project is currently undergoing a feasibility study, which remains on schedule for release by the end of 2013.

Ian Cunningham-Dunlop, P. Eng., is the Company’s Senior Vice President Exploration and designated Qualified Person for this news release within the meaning of NI 43-101 and has reviewed and verified that the technical information contained in this release is accurate and approves of the written disclosure of same.

All new exploration holes at Kao were drilled at 090, 225 or 270 degrees azimuth, with dips of either -60 or -90 degrees, and to an average depth of 150 metres. True widths are estimated to be 70 to 90% of the intersected widths. Samples were assayed for gold by ALS Chemex in Ouagadougou, Burkina Faso. Assays were done by Fire Assay with AAS finish and repeats of all AAS assays over 5.0 g/t by Fire Assay with gravimetric finish. Control samples (accredited standards, blanks and duplicate samples at the preparation stage) were inserted on a regular basis. Results were monitored on receipt of assays.

About True Gold

True Gold Mining Inc. is where gold comes to life. We are committed to growing a successful gold exploration, development and production company, by focusing on projects with low costs, low technical risks and solid economics. The Company’s board, management and technical teams have proven track records in gold exploration, development, operations and production worldwide.

Additional information about the Company and its activities may be found on the Company’s website at www.truegoldmining.com and under the Company’s profile at www.sedar.com.