Sandvik to supply seven Bolter Miners to Shendong coal operation in China

Sandvik Mining and Construction has had a major order from China Shenhua Energy’s Shendong coal production centre. The contract includes a total of seven low-profile Sandvik Bolter Miners MB670 to be supplied to the operation during 2010, with delivery commencing in May. The MB670 is equipped to simultaneously cut a rectangular shaped roadway and install roof and rib bolts. It can be operated at top speeds in modern development layouts thanks to its ability to cut and install roof support in simultaneous operations. (more…)