![](https://www.mining.com/wp-content/uploads/2020/09/san-francisco-mine-magna-gold.png)
Magna tables PFS with ‘base-case’ plan for San Francisco gold mine
Study suggests a 16,875 t/d heap-leach operation, using existing processing capacity, generating an average of 69,000 gold oz. per year between 2021 and 2027 at AISCs of $1,204 per oz.