![](https://www.mining.com/wp-content/uploads/2024/02/Fission-PLS-camp-with-snow-1024x711.jpg)
Fission raising $55 million to advance PLS uranium project in Athabasca Basin
A feasibility study produced for the project was filed in March 2023 outlining a construction period of three years at a cost of $1.16 billion to develop a mine with a 10-year life.