The figures demonstrate that developing nations in South East Asia require high quality coal to meet increased electricity demand, powered by the growing urbanization of the population.
BHP wants find a way to up output for the industrial metal from its Olympic Dam by 40% even before a proposed and long-awaited mega-expansion of the operation takes place.