Quantum Rare Earth Developments Corp. (TSX VENTURE:QRE)(OTCQX:QREDF)(FRANKFURT:BR3) (“Quantum”, the “Company”) is pleased to announce results for two additional holes of the first of five drill holes from the spring/summer 2011 exploration program at the Elk Creek Niobium – REE Project, located in southeastern Nebraska, USA. Drill holes NEC11-002 and NEC11-003 are the remaining two of three holes which were completed to test the Elk Creek Niobium Deposit.
Highlights from the current exploration include:
(Results previously released July 27, 2011)
Management of Quantum are very pleased with the results as they provide additional information on areas of the deposit at depth where limited information was previously available, but also confirm the strong grade and size potential of the Niobium structure indicated by previous drilling by Molycorp.
Drill hole NEC11-002 was drilled at a -55° inclination at a direction of 035° to a depth of 908.61 metres (a drill plan and cross-section are available on the company’s website at http://www.quantumrareearth.com). The hole was drilled in the northwestern portion of the deposit at depth. A significant zone of Middle and Heavy Rare Earth (MHREO*) mineralization of between 28% to 43% MHREO, with notable enrichment in Europium, Gadolinium, Terbium and Dysprosium was encountered in this hole, similar to the MHREO enrichment found in hole NEC11-001.
Drill hole NEC11-003 was drilled at a -65 inclination at a direction of 035° to a depth of 508.71 metres. The hole was drilled in the southeastern portion of the deposit.
Exploration at the Elk Creek Niobium Deposit was designed to accomplish several objectives: