Thor Explorations Announces Q4 2023 Operating Update and 2024 Operating Guidance

This Announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 ("MAR"). Upon the publication of this Announcement, this inside information is now considered to be in the public domain.

Vancouver, British Columbia--(Newsfile Corp. - January 15, 2024) - Thor Explorations Ltd. (TSXV: THX) (AIM: THX) ("Thor Explorations" or the "Company") is pleased to provide an operational update for the Segilola Gold mine, located in Nigeria ("Segilola"), and for the Company's mineral exploration properties located in Nigeria and Senegal, for the three months to December 31, 2023 (the "Quarter" or "Q4") as well as full year operational highlights ("FY 2023").

Segilola 2023 Operational Highlights

  • FY 2023 gold production of 84,609 ounces ("oz"):
    • 21,798 oz during the Quarter at an average grade of 2.77 grammes per tonne ("g/t") of gold ("Au")
  • Successfully completed push back of Segilola Western Wall
  • Successfully upgraded process plant elution and electrowinning system
  • Acquisition of additional gold and lithium exploration tenure in Nigeria
  • Continuation of drilling programs on near mine and regional targets
  • Segilola underground exploration drilling program to commence in H1 2024

Segilola 2023 Exploration Update Highlights

  • Focus of gold exploration activities for FY 2023 has been on prospects within a 40-kilometre ("km") radius from the Segilola project.
  • Majority of the exploration activities carried out on all the Company's licences, consisted of Reverse Circulation ("RC") drilling, Diamond Drilling, geochemical stream sediment sampling, auger drilling and soil sampling,
  • The Company successfully drilled a number of high-grade intercepts at two key prospects within a 25km radius of the Segilola Plant.
  • The greenfield discovery at Kola located 23km to the south returned several high-grade encouraging drill results and has opened up a new front of exploration potential to the south, an area which is now of priority.
  • The Ijarigbe Prospect is located 23km north of Segilola. This prospect has been defined by a number of stream sediment anomalies and soil anomalies which returned values of up to 9.40g/tAu.
  • Southern Prospects located 25km south of Segilola was drilled during Q4 2023 and returned encouraging high-grade intercepts, including at the Kola Prospect:
    • SGRC188: 4 metres at 30.2g/t Au from 14 metres
    • SGRC 189: 8 metres at 3.0g/t Au from 56 metres
    • SGRC 190: 7 metres at 26g/t Au from 49 metres
    • SGRC 194: 7 metres at 34.2g/t Au from 49 metres
    • Previously unreported drilled in Q4 2023
    • SGRC 236: 2 metres at 12.61g/t Au from 49 metres
    • SGD 295: 5 metres at 11.25g/t Au from 15 metres
    • SGD 296: 3 metres at 2.49g/t Au from 55.5 metres

Douta Exploration Highlights

  • Final set of drill results received in Q4 2023 after completing a 14,000 metre RC drilling program. Results highlights include:
    • DTRC 871: 16 metres at 2.26g/t from 93 metres
    • DTRC874: 4 metres at 3.55g/t from 91 metres
    • DTRC 895: 8 metres at 2.61g/t from 8 metres
    • DTRD 845: 9 metres at 4.33 g/t from 93 metres
  • Wide zones of near surface, high grade oxide mineralisation identified

Lithium Exploration

  • Initial set of encouraging drill results received in Q3 2023 as previously announced
  • Land portfolio increased to include additional project areas
  • Focus on scout drilling across a number of targets through H1 2024
  • Continued acquisition of prospective lithium exploration ground in Nigeria

FY 2024 outlook and catalysts

  • FY 2024 production guidance range set at 95,000 to 100,000 oz of gold
  • FY 2024 All-in Sustaining Cost ("AISC") guidance range set at $1,100 to $1,200
  • Strong exploration focus on Segilola near mine drill targets and underground drilling program in H1 2024 with an initial 5,000 metre drilling program delineated
  • Updated Mineral Resource Estimate at the Douta Project to be completed in Q1 2024
  • Preliminary Feasibility Study ("PFS") test work is ongoing at the Douta project in Senegal, focusing on the metallurgy and process flow sheet targeting publication in Q1 2024 following the updated Mineral Resource Estimate
  • Continued lithium target generation including a further scout drilling program across a number of targets

Segun Lawson, President & CEO, stated:

"I am pleased that the Company was able to successfully complete what was projected to be the most operationally challenging year in the Segilola mine plan. We were able to complete the year producing 84,600 ounces, however, most importantly, we have positioned the mine very strongly for the coming years."

"We expect that the successful completion of the west wall push back and the improvements made to the processing plant will allow the mine to operate more efficiently whilst also making accelerated drawdown of the current high levels of the gold in circuit through the course of the year."

"In Nigeria, we have made small but very important discoveries within trucking distance of the Segilola plant. The area within a 40km radius of the Segilola Mine has been a key exploration focus for potential high-grade satellite resources that can be transported economically to the central processing plant at Segilola. There were encouraging high-grade drill results from the Kola Prospect in the Southern Prospects, which opens up a new front of exploration potential to the south. In addition, further encouraging geochemical sampling results from the Central Prospects are indicative of the potential for high-grade resource within close proximity to the plant. We are looking forward to our drilling program on our delineated targets in the first half of this year. Now we have completed the push back of the west wall, our priority this year is on exploration aimed at increasing the Segilola mine life. With this in mind, we are also commencing our underground drilling program in H1 2024."

"We are also pleased with the progress made at Douta. We were encouraged by the final set of drill results received in Q4 2023 and have been working on the Preliminary Feasibility Study. The current focus has been on the metallurgy and the process flowsheet, and we expect to update the market with an updated resource estimate and, subsequently, a Preliminary Feasibility Study in Q1 2024."

Production Summary

Units2023TotalQ4 2023Q3 2023Q2 2023Q1 2023
Mining
Total MinedTonnes20,984,8615,483,2915,673,1935,633,688 4,194,689
Waste MinedTonnes19,753,5805,031,9325,370,2795,355,105 3,996,264
Ore MinedTonnes1,231,283451,360302,915278,583 198,425
Gradeg/t Au2.321.932.442.43 2.85
Processing
Ore ProcessedTonnes1,010,343262,439261,671255,231231,001
Gradeg/t Au2.792.772.462.992.95
Recovery%93.593.492.394.094.1
Gold Recoveredoz84,60921,79819,10423,07820,629

 

Table 1: Production Summary

Nigeria Exploration

In Nigeria, Thor's exploration focus is its wholly-owned exploration permits within a 40km radius of the Segilola mining operation. Two main advanced exploration target areas, i.e., the Central and Southern Prospect Areas, have been defined within a 40km radius of the Segilola Gold Mine (Figure 1). These areas encompass a number of targets, some of which have received initial drill testing.

Figure 1: Segilola Exploration Targets

To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_002full.jpg

Central Prospects

There are two main focus areas with this prospect:

  • Ijarigbe
  • Ekiti

IjarigbeThe Ijarigbe Prospect is located 22km north of Segilola and is defined by numerous stream sediment anomalies ranging from 0.65 to 23.13g/tAu. Initial follow up geochemical soil sampling has returned values of up to 9.40g/tAu (Figure 2).

Figure 2: Ijarigbe Prospect MapTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_003full.jpg

Southern Prospects

The Southern Prospects is located 23km south of the Segilola Gold Mine within a 100% Thor-owned exploration permit (Figure 1). The prospect developed from a low-level stream sediment anomaly located in the northern portion of EL28801 which was confirmed by follow-up auger-assisted soil geochemistry that returned values of up to 4g/tAu. Targeting of this anomalous zone was carried out with reverse circulation drilling.

Initial positive results included 7 metres grading 25.98g/tAu in the near-surface weathered horizon. Additional drilling located primary bedrock mineralisation grading 8 metres at 30.19g/tAu. Initial data suggest that the geological controls relate to a steeply-dipping north-easterly trending zone within a biotite gneiss sequence. Exploration testing of the general area is continuing. The significant intersections are listed in Table 2.

Hole IDxyDepthDipAzimuthFrom (m)To (m)Interval (m)Grade (g/tAu)
SGRC23669990180789860-6090202662.24
SGRC2364951212.61
SGD29269992580786959.5-602800220.92
SGD29569992480789172.3-602701520511.25
SGD296699967807891100-6027055.558.42.92.49

 

Table 2: Southern Prospects Significant Results(0.5g/tAu lower cut off; maximum 1m internal dilution)

Figure 3: Southern Prospects Drillhole Location Map

To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_004full.jpg

Newstar Lithium

Thor has secured over 600 square kilometres ("km2") of granted tenure in Nigeria that form Oyo State, Kwara State and Ekiti State Lithium Project Areas. Activities for the Quarter comprised initial exploratory drilling in the Ekiti Project Area. Exploration activities were focussed on the Oyo and Ekiti areas with surface geochemical programs and shallow drilling undertaken.

Sample TypeNumber
Auger/Soil 671
Total671

 

Table 3: Geochemical Sampling Statistics

OyoLithological mapping carried out in Q3 2023 identified exposure of several northerly trending pegmatites. A reconnaissance geochemical soil program was designed covering a total area of 40km2, on a spacing of 400 metres by 50 metres in EL42245. The objective is to produce a robust project-wide dataset that will provide comprehensive multi-element data which will guide the ongoing exploration of the region. During the reporting period 671 samples were collected and submitted for laboratory analysis. Results are pending.

Figure 4: Oyo Project Area

To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_005full.jpg

EkitiWidespread pegmatite occurrences have been located in the Ekiti area (Figure 4). A limited drilling program has commenced to follow-up on reconnaissance mapping and rock chip sampling carried out to the west and north of Ijero. Results from this drilling are pending.

Figure 5: Ekiti Project Area

To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_006full.jpg

SENEGAL

Introduction

The Douta Gold Project is a gold exploration permit (E02038), located within the Kéniéba inlier, eastern Senegal. The northeast-trending license has an area of 58km2. Thor, through its wholly owned subsidiary African Star Resources Incorporated ("African Star"), has a 70% economic interest in partnership with the permit holder International Mining Company SARL ("IMC"). IMC has a 30% free carried interest in its development until the announcement by Thor of a Probable Reserve.

The Douta licence is strategically positioned 4km east of Massawa North and Massawa Central deposits, which form part of the world-class Sabadola-Massawa Project owned by Endeavour Mining. The Makabingui deposit, belonging to Bassari Resources Ltd, is immediately located east of the northern portion of E02038.

Drilling Results

No drilling activities took place during the Quarter. However, assays from drilling completed in the previous quarter were received. The significant intersections from this program are listed in Table 4 and shown on Figure 4. Drill samples were analysed by ALS Laboratories in Mali using the AA26 fire assay method (50 gram charge).

Hole IDxyDepthDipAzimuthFrom (m)To (m)Interval (m)Grade (g/tAu)
DTRC8701763251437255135-5013093104111.19
DTRC871176446143730860-501302844162.26
DTRC8741765181437488125-50130919543.55
DTRC8751764901437512150-50130119130112.03
DTRC895177799143900138-5013081682.61
DTRC896177778143901890-50130263043.10
DTRC9031774121438581174-5013012012665.21
DTRC9051775221438705116-50130354163.18
DTRC9056374111.15
DTRC9071776721438964154-50130118131130.99
DTRD8451744531434815180-501309310294.33

 

Table 4: Douta Project Significant Results (>12 gram-metres: grade*true width)(0.5g/tAu lower cut off; minimum width 2m with 2m max internal waste)

Figure 5: Douta Drillhole Location Plan

To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/7003/194241_b5e54403a4c01b59_007full.jpg

Hole IDxyDepthDipAzimuthFrom (m)To (m)Interval (m)Grade (g/tAu)
DTRC866176224143711490-501306375120.99
DTRC8671762901437191102-50130828421
DTRC8678999100.73
DTRC8681762721437209147-50130172140.82
DTRC86810811790.85
DTRC86811912120.71
DTRC869176349143723786-50130657270.96
DTRC869818430.65
DTRC8701763251437255135-50130747621.37
DTRC87093104111.19
DTRC871176446143730860-501302844162.26
DTRC8721764141437334122-50130808660.81
DTRC872889020.75
DTRC8731763881437354160-5013012112870.93
DTRC8741765181437488125-50130919543.55
DTRC8751764901437512150-50130232630.94
DTRC875119130112.03
DTRC876176574143744054-501302640.55
DTRC877176547143746584-501304959101.15
DTRC877717980.74
DTRC878176616143754180-50130253160.79
DTRC8783242100.89
DTRC878616541.09
DTRC8791765941437559108-501305767101.17
DTRC879747620.81
DTRC8801765731437577120-50130839071.6
DTRC881176699143760465-5013071141.52
DTRC882176674143762584-501305941.67
DTRC882404441.29
DTRC8831766571437642102-50130333520.82
DTRC883737520.69
DTRC883798560.69
DTRC8841767051437732102-501307888100.98
DTRC8851767471437823110-50130869480.88
DTRC886177063143813463-501301828100.88
DTRC886454833.06
DTRC886565820.75
DTRC8871770281438163108-50130161820.62
DTRC887384020.78
DTRC887444620.7
DTRC887535851.03
DTRC887606331.31
DTRC887848950.95
DTRC889176060143687780-50130283460.85
DTRC889475140.79
DTRC889606221.16
DTRC8901760431436891100-501307586111
DTRC892177619143878872-50130212541.03
DTRC893177713143893166-50130121861.14
DTRC893232520.91
DTRC893303220.89
DTRC893373921.28
DTRC893495340.74
DTRC8941776941438947120-50130485461.66
DTRC894697341.16
DTRC89410310740.7
DTRC895177799143900138-5013081682.61
DTRC896177778143901890-50130151830.9
DTRC896263043.1
DTRC896626751.38
DTRC896717981.19
DTRC8971767721437870130-501309910560.93
DTRC8981767221437843150-5013012813240.81
DTRC8991765511437591148-50130919321.34
DTRC89911612150.84
DTRC89912512941.46
DTRC9001755511436344227.8-5013017417620.91
DTRC90019220190.91
DTRC90022022550.88
DTRC9011772881438429144-50130222421.06
DTRC901717541.41
DTRC90110210532.13
DTRC9021772591438454176-50130272920.81
DTRC902435181.14
DTRC9028393101.19
DTRC9029710250.68
DTRC90210711250.88
DTRC90211512050.95
DTRC90213914231.69
DTRC9031774121438581174-50130303660.9
DTRC903656830.62
DTRC903727970.82
DTRC90312012665.21
DTRC9041774311438561126-50130283351.71
DTRC904495452.14
DTRC9051775221438705116-50130354163.18
DTRC905515430.75
DTRC905586021.27
DTRC9056374111.15
DTRC9061775011438723124-50130646841.35
DTRC906869260.95
DTRC9069810681.33
DTRC9071776721438964154-50130848730.5
DTRC907899120.71
DTRC90711011330.92
DTRC907118131130.99
DTRC907135145100.66
DTRD8451744531434815180-501309310294.33

 

DepositClassificationTonnage (xMt)Grade (g/t Au)Contained Metal (koz Au)Thor InterestAttributable OuncesSource
SegilolaIndicated*4.064.66608100%6081
SegilolaInferred*0.4434.7868100%681
MakosaInferred15.31.5373070%5112

 

  • *not depleted for mining

Source

1 Sedar Filing March 21 2019: Technical Report On The Segilola Gold Project Feasibility Study, Osun State, Nigeria2 Sedar Filing Jan 4 2022: Independent Technical Report: Mineral Resource Estimate, Douta Gold Project, Senegal

APPENDIX 1: Kola Prospect Drill Results

Hole IDxyDepthDipAzimuthFrom (m)To (m)Interval (m)Grade (g/tAu)
SGD29269992580786959.5-602800220.92
SGD29269992580786959.5-60270nsr
SGD294699996807875133-60270nsr
SGD29569992480789172.3-602701520511.25
SGD296699967807891100-6027055.558.42.92.49
SGRC16769992780782555-6090nsr
SGRC16869989780787556-60901210.96
SGRC16969987780787758-6090nsr
SGRC18370001080787550-6090nsr
SGRC18469998380787655-6090nsr
SGRC18569995980783050-60270nsr
SGRC186699929807826100-60270nsr
SGRC18869989780787556-60901418430.17
SGRC18969992580787190-6090566483.01
SGRC190699954807866120-609029725.98
SGRC19169989680787760-60901655.64
SGRC19269995580787255-6090nsr
SGRC193699939807845115-60300nsr
SGRC194699924807872-60904653734.18
SGRC19455-60270555721.83
SGRC195699979807892105-60270nsr
SGRC19669995280792170-58.6270nsr
SGRC19769997980792280-900nsr
SGRC19869993080792430-900nsr
SGRC199699961807893105-6090172031.97
SGRC20069988080792430-900nsr
SGRC20169992680787941-900nsr
SGRC20269992080787031-9000770.79
SGRC20369991380787026-900013138.34
SGRC203141730.71
SGRC203212321.22
SGRC20469993880788970-6027051160.73
SGRC205699998807923120-61267.4nsr
SGRC20869990180787331-900nsr
SGRC20969989380786926-900nsr
SGRC21069989280785731-900nsr
SGRC21169990380785936-900nsr
SGRC21269991280786131-900nsr
SGRC21369991880784780-57.289.1nsr
SGRC21469993280789241-900nsr
SGRC21569992180789031-6090172252.54
SGRC21669990980788930-900nsr
SGRC21769989980789031-900nsr
SGRC21869989080789040-900nsr
SGRC21969994580790350-60270nsr
SGRC220699957807910110-60.1244.5nsr
SGRC221699980807910120-63.9270nsr
SGRC22270000080791085-60270nsr
SGRC22369992580792380-60270nsr
SGRC234699850807899702421.76
SGRC23569987780789970nsr
SGRC23669990180789860-6090202662.24
SGRC2364951212.61

 

THOR EXPLORATIONS LTD.Segun LawsonPresident & CEO

About ThorThor Explorations Ltd. is a Canadian mineral exploration company engaged in the acquisition, exploration and development of mineral properties located in Nigeria, Senegal and Burkina Faso. Thor holds a 100% interest in the Segilola Gold Project located in Osun State of Nigeria. Mining and production commenced at Segilola in 2021. Thor holds a 70% interest in the Douta Gold Project located in south-eastern Senegal. Thor trades on the TSX Venture Exchange under the symbol "THX".

For further information please contact:

Thor Explorations LtdEmail: [email protected]

Canaccord Genuity (Nominated Adviser & Broker)Henry Fitzgerald-O'Connor / James Asensio / Harry Rees

Tel: +44 (0) 20 7523 8000

Hannam & Partners (Broker)Andrew Chubb / Matt Hasson / Jay Ashfield / Franck Nganou

Tel: +44 (0) 20 7907 8500

Fig House Communications (Investor Relations)Tel: +1 416 822 6483Email: [email protected]

Yellow Jersey PR (Financial PR)Charles Goodwin / Shivantha Thambirajah / Soraya JacksonTel: +44 (0) 20 3004 9512

BlytheRay (Financial PR)Tim Blythe / Megan Ray / Said IzagarenTel: +44 207 138 3203

Qualified PersonThe above information has been prepared under the supervision of Alfred Gillman (Fellow AusIMM, CP), who is designated as a "qualified person" under National Instrument 43-101 and the AIM Rules and has reviewed and approves the content of this news release. He has also reviewed QA/QC, sampling, analytical and test data underlying the information.

NOT FOR DISSEMINATION IN THE UNITED STATES OR FORDISTRIBUTION TO U.S. WIRE SERVICES

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/194241

Latest Stories