Toronto, Ontario--(Newsfile Corp. - June 13, 2023) - Canadian Copper Inc. (CSE: CCI) ("Canadian Copper" or the "Company") is pleased to announce that, pursuant to the terms of a Letter of Intent ("LOI") it entered into with Votorantim Metals Canada Inc., an arm's length seller ("VM Canada" or the "Seller"), it intends to acquire VM Canada's entire 72% interest in the Murray Brook Joint Venture. Murray Brook is located in the Bathurst Camp of New Brunswick, Canada.
"Our objective to secure majority ownership of the Murray Brook deposit has been central to our growth strategy since 2022. This potential acquisition of a large, advanced-stage polymetallic asset is transformative for Canadian Copper. This considered transaction would firmly establish the Company's footprint as a base metal explorer with significant mineral resources in the Bathurst Camp. The Murray Brook deposit contains 183 million pounds of copper, 1.07 billion pounds of zinc, 390 million pounds of lead, 42 million ounces of silver, and 339,000 ounces of gold," commented Simon Quick, CEO of Canadian Copper. "This compliments our current Chester asset very well with estimated Measured Resources totaling 120 million pounds of copper. This opportunity enables possible synergies with the Chester deposit through the implementation of hub and spoke processing. Several deposits in the region extend beyond 1,000 meters in depth, thus we are excited to test the vertical depth extent of Murray Brook beyond the previously explored 350 meters," he added.
With the exception of the information included under the heading "Value Creation Opportunities: Integrate Scoping Studies and Update Project Economics", all technical information concerning the Murray Brook project in this press release has been derived from the "Technical Report and Preliminary Economic Assessment (PEA) of the Murray Brook Project New Brunswick Canada" with an effective date of June 4, 2013 prepared by P&E Mining Consultants Inc, under the supervision of Eugene Puritch, P. Eng., for Votorantim Metals Canada Inc. and El Nino Ventures Inc. and filed on www.sedar.com (the "Murray Brook Technical Report and PEA").
Canadian Copper is not treating the "historical resources estimate" as a "current resources estimate" or "mineral reserves", as it has not taken steps to identify what work is required to verify, upgrade or re-classify the "historical resources estimate" using a qualified person. Company believes the historical resource estimates to be both relevant and reliable. The information provides an indication of the exploration potential of Murray Brook but may not be representative of expected results.
The strategic merits of this transaction for Canadian Copper shareholders are:
Transaction Detail
The Company and Seller have agreed to the following considerations under the LOI signed February 13, 2023, which is subject to exchange approvals, and the execution of a definitive purchase agreement ("PA"). For additional acquisition details, please click here.
After the Company satisfies conditions #1-5, Canadian Copper will have completed its purchase of a 72% interest in the MB Joint Venture, and the minority partner will retain the remaining 28% interest. The joint-venture agreement ("JVA") stipulates that the minority party contribute its proportionate share for expenditures or be diluted. There is no minority party dilution provision where their interest converts to an NSR.
Large Historical Mineral Resource with Thick Drill Intersections
The Murray Brook deposit is the 5th1 largest VMS deposit within the Bathurst Camp, which ranks 3rd globally as a major VMS district. Murray Brook has a historical resource estimate prepared in accordance with the requirements of Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The Measured and Indicated Mineral Resource is 18 million tonnes grading 0.47% Cu, 2.73% Zn, 0.99% Pb, 42 g/t Ag, and 0.59 g/t Au. The contained copper and zinc metal within this Mineral Resource is approximately 210 million pounds of copper and 1.15 billion pounds of zinc. The open pit Mineral Resource is summarized below in Table A.
The mineralization forms a coherent massive sulphide deposit hosted within a sheath fold; enveloped by chlorite-sericite alteration as a halo. There are two distinct lenses to the deposit; a western lens which is deeper and zinc-rich and an eastern lens that is shallower and copper-rich with some zinc. The bottom of the deposit is approximately 350 meters below surface.
Examples of the higher-grade thick intervals are, for additional results please click here:
Table A: Murray Brook Historical Resource Estimate*
Murray Brook In-Pit Mineral Resource Estimate at C$21/T NSR Cut-Off From PEA | ||||||||||||
Zone | Classification | Tonnes | Cu% | Cu Mlb | Pb% | Pb M lb | Zn% | Zn M lb | Aug/t | Au Koz | Agg/t | Ag M oz |
Oxide | Measured | 981,000 | 0.9 | 19.5 | 0.89 | 19.2 | 2.73 | 59 | 0.33 | 10.5 | 39.8 | 1.3 |
Indicated | 302,000 | 1.02 | 6.8 | 0.69 | 4.6 | 2.05 | 13.7 | 0.54 | 5.3 | 33.9 | 0.3 | |
M+I | 1,283,000 | 0.93 | 26.3 | 0.84 | 23.8 | 2.57 | 72.7 | 0.38 | 15.8 | 38.4 | 1.6 | |
Inferred | 4,000 | 3.69 | 0.3 | 0.17 | 0 | 0.57 | 0.1 | 0.43 | 0.1 | 25.4 | 0 | |
Sulphide | Measured | 11,306,000 | 0.4 | 100.7 | 1.04 | 258.3 | 2.97 | 741.2 | 0.5 | 182.7 | 42.5 | 15.4 |
Indicated | 6,578,000 | 0.57 | 82.9 | 0.91 | 131.6 | 2.32 | 336.8 | 0.74 | 155.5 | 40.3 | 8.5 | |
M+I | 17,884,000 | 0.47 | 183.6 | 0.99 | 389.9 | 2.73 | 1,078.1 | 0.59 | 338.2 | 41.7 | 23.9 | |
Inferred | 284,000 | 1.57 | 9.8 | 0.5 | 3.1 | 1.36 | 8.5 | 0.47 | 4.3 | 28.7 | 0.3 |
Note: M lb - millions of pounds, K oz - thousands of ounces and M oz = millions of ounces
* Murray Brook Technical Report and PEA
Canadian Copper is not treating the "historical resources estimate" as a "current resources estimate" or "mineral reserves", as it has not taken steps to identify what work is required to verify, upgrade or re-classify the "historical resources estimate" using a qualified person.Value Creation Opportunities: Integrate Scoping Studies and Update Project Economics
The Murray Brook Technical Report and PEA was completed on Murray Brook in 2013. The operating metrics and financial summary from that report are presented below in Table A. Exploration work and project advancements have occurred at Murray Brook since the Murray Brook Technical Report and PEA, that when incorporated into a new PEA, could improve the project economics, such as:
Table B: Murray Brook July 2013 PEA Summary
Ore Throughput | 6,000 | tpd | ||
Mine Life | 10 | Years | ||
Strip Ratio | 4.32 | waste:ore | ||
Initial Capex | 261 | C$M | ||
LOM Capex | 335 | C$M | ||
Cost/Tonne Milled | 27.81 | C$ | ||
Zinc Production | 91.4 | M lbs. pa | ||
Copper Production | 9.2 | M lbs. pa | ||
Lead Production | 13.6 | M lbs. pa | ||
Silver Production | 1.3 | M lbs. pa | ||
Gold Production | None |
The Murray Brook Technical Report and PEA is preliminary in nature and its mineable tonnage includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the preliminary assessment will be realized.
Figure A: Property Location
Murray Brook Project Location MapTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/9218/169694_1f7038f3541a2b24_001full.jpg
Qualified Persons
Mr. Eugene Puritch, P.Eng., FEC, CET, President of P&E Mining Consultants Inc. and independent Qualified Person as defined in NI 43-101, has reviewed and approved the scientific and technical content of this news release.
About Canadian Copper Inc.
Canadian Copper is a Canadian-based mineral exploration company with a copper and base metals portfolio of historical resources and grassroots projects. The Company is focused on the prolific Bathurst Mining Camp (BMC) of New Brunswick, Canada. There are currently 70,555,000 shares issued and outstanding in the Company.
For more information, please contact:
Simon Quick, Director and CEO
email [email protected] / [email protected]phone (905)-220-6661web www.canadiancopper.com
Neither the CSE nor its Market Regulator (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary and Forward-Looking Statements
This news release includes certain forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the statements regarding the potential acquisition of the MB Deposit from the Seller including the ability of the Company to fulfill the terms under the LOI, the growth of Canadian Copper's mineral resources, expanded asset base, market and regulatory approval, future exploration programs, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Often, but not always, forward-looking information can be identified by words such as "pro forma", "plans", "expects", "will", "may", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, statements as to the anticipated business plans and timing of future activities of the Company, including the Company's option to acquire properties under the Puma Option Agreement, the proposed expenditures for exploration work thereon, the ability of the Company to obtain sufficient financing to fund its business activities and plans, delays in obtaining governmental and regulatory approvals (including of the CSE), permits or financing, changes in laws, regulations and policies affecting mining operations, the Company's limited operating history, currency fluctuations, title disputes or claims, environmental issues and liabilities, as well as those factors discussed under the heading "Risk Factors" in the Company's prospectus dated May 24th, 2022 and other filings of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile on the System for Electronic Document Analysis and Retrieval website at www.sedar.com. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this presentation or incorporated by reference herein, except as otherwise required by law.
Cautionary Note Regarding Mineral Resource Estimates and Historical Estimates
Until mineral deposits are actually mined and processed, Mineral Resources must be considered as estimates only. Mineral Resource Estimates that are not Mineral Reserves have not demonstrated economic viability. Canadian Copper is not treating the "historical resources estimate" as a "current resources estimate" or "mineral reserves", as it has not taken steps to identify what work needs to be done to verify, upgrade or re-classify the "historical resources estimate" using a qualified person.
1 https://www.northernminer.com/news/el-nino-ventures-posts-new-resource-in-new-brunswick/1000961181/
2"Puma Exploration Discovers a New Copper Zone at Murray Brook" posted on GlobalNewswire on April 10, 2019 by Puma Exploration Inc.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/169694