New gold mine in Côte d’Ivoire ramping up

Perseus Mining (ASX,TSX:PRU) will soon start pouring gold from its Sissingué gold mine in Côte d’Ivoire, having delivered the first crushed ore to the mill and processing plant earlier this month.
Dual-listed Perseus already has a producing mine, the Edikan gold mine in Ghana, which comprises a group of large gold deposits located in the Ashanti gold belt. The Sissingué mine would be the company’s second producing asset; the project is located southeast of the 7Moz Morila gold mine and northwest of the 4.3Moz Tongon deposit. It is estimated to produce 358,000 ounces over the 5-year life of mine, including 80,000 annually for the first three and a quarter years, and around 70,000 oz each year throughout its lifespan.
It is estimated to produce 358,000 ounces over the 5-year life of mine
“We are looking forward very much to starting gold production later in January 2018 and to seeing Sissingué ramp-up to full-scale production and positive cash flow by the end of the March quarter,” Perseus CEO Jeff Quartermaine said in a news release. “At that point, Perseus will be transformed from a single mine, single country business to a multi-mine, multi-jurisdiction operation and we will be well on the way to achieving our goal of producing in excess of 500,000 oz of gold per year from late-2021 from our three West African operations, namely Edikan, Sissingué, and Yaouré.” A feasibility study on Yaouré was announced in November.
Capital costs at Sissingué are estimated at US$107 million. Once in operation cash costs are estimated at US$625 per ounce for the first 3.25 years and $630 for life of mine.
Côte d’Ivoire is under-rated as a mining jurisdiction compared to neighbouring Mali, which is Africa’s third biggest gold producer. According to a recent report by BMI Research, Côte d’Ivoire and Mali are expected to show mining growth of 15.6% and 10% respectively, between 2017 and 2021. In November the Mali government said it expected to beat anticipated 2017 gold production.
BMI names a new mining code introduced in 2014, strong infrastructure growth, and the country’s drive to become a West African power hub, among factors that would allow Côte d’Ivoire’s mining industry to grow.
Recent developments include Endeavour Mining’s (TSX:EDV) discovery in 2016 at the Ity gold mine which could extend the mine’s life by 10 years, and the uncovering of a 17-kilometre-long trend the same year by Toro Gold and Predictive Discovery; the two companies have a joint venture (JV) to operate 4 exploration permits.
In November Endeavour and Randgold Resources (LON:RRS) created an exploration JV covering their adjacent Sissedougou and Mankono exploration properties located in the northern region of Côte d’Ivoire. A $3.8 million exploration campaign was approved for the remainder of 2017 and 2018.
More News
Lithium Americas reaches final investment decision for Thacker Pass mine
Once open, Thacker Pass is expected to produce 40,000 metric tons of battery-quality lithium carbonate per year.
April 01, 2025 | 03:05 pm
Gold retreats from record as traders brace for Trump’s tariffs
Traders are on edge as Trump plans to announce sweeping levies on all of America’s trading partners on Wednesday, raising the risks of retaliatory measures.
April 01, 2025 | 12:58 pm
{{ commodity.name }}
{{ post.title }}
{{ post.excerpt }}
{{ post.date }}
Comments