Markets single - MINING.COM
52 weeks
Low | High
Last Close:

1 Week

1 Month

3 Months

6 Months

1 Year

5 Years

Historical

Related Commodities

Create FREE account or log in

to receive MINING.COM digests


Latest Stories

Nautilus Minerals to raise $100 million for PNG seafloor project

Nautilus Minerals (TSX:NUS)(AIM:NUS) is to raise approximately US$100 million (C$98.1 million*) through a private placement of common shares to fund the development of its first project, Solwara 1, in the Bismarck Sea of Papua New Guinea. The placing will involve the issue of approximately 39 million shares to a number of investors at a price of CAD$2.52 (US$2.58) per share. Nautilus President and CEO Steve Rogers said the private placement would provide funds for the construction of the seafloor resource production system, which initially will be deployed at Solwara 1 – the company's first deepwater copper and gold project.

Daryl Hannah arrested

Actress Daryl Hannah was arrested Tuesday during a sit-in in front of the White House protesting a pipeline expansion project that would significantly increase the amount of oil the United States imports from Canada’s controversial Alberta oil sands. Image from Вени Марковски

Lithium One defines new zone of high grade lithium-potash brine at Sal de Vida

VANCOUVER, CANADA--(Marketwire - Aug. 31, 2011) - Lithium One Inc. (the "Company") (TSX VENTURE:LI), is pleased to report the delineation of a new zone (the "North Basin") containing thick halite sequences hosting high grade lithium and potassium brine at the Sal de Vida Project at Salar del Hombre Muerto, Argentina. The five core holes in this new discovery report grades averaging 852 mg/L lithium and 10,181 mg/L potassium within the first 55 metres from surface, with no cut-offs applied. The 50 kmNorth Basin is adjacent to, but geologically separated from, the 170 kmCentral Basin where the Company has previously defined an inferred resource1 of 5.4 million tonnes Lithium Carbonate equivalent and 21 million tonnes potassium chloride equivalent (1,470M m3 at 695 mg/L Li and 7590 mg/L K).

Osisko announces an increase in Caterpillar Lease Financing Facility

MONTREAL, QUEBEC--(Marketwire - Aug. 31, 2011) - Osisko Mining Corporation ("Osisko")(TSX:OSK)(FRANKFURT:EWX) is pleased to announce that it has entered into an agreement with Caterpillar Financial ("Cat Financial") to increase its equipment leasing facility by US $56.3 million. The facility will be used to acquire additional mobile mining equipment fleet to develop the Canadian Malartic Mine and the Barnat gold deposit.

BCGold Corp. closes first tranche of private placement

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 31, 2011) - BCGold Corp. (TSX VENTURE:BCG)(PINK SHEETS:BCGOF) (the "Company") is pleased to announce that it has closed the first tranche of its private placement previously announced on July 11, 2011. The Company has raised $1,472,440 through the issuance of 2,660,000 of non-flow through units (the "NFT Units") at a price of $0.10 per NFT Unit and 10,053,663 flow through units (the "FT Units") at a price of $0.12 per FT Unit.

Mining giant backs new Australian International Arbitration Rules

SYDNEY, Aug. 31, 2011 /PRNewswire/ -- Vice President of Litigation BHP Billiton, Mr Damian Lovellhas today welcomed the introduction of the new ACICA Arbitration Rules designed to speed up the resolution of cross border and international commercial disputes. Mr Lovell, who is responsible for the dispute resolution strategy for the world's largest diversified mining company, said it is standard practice for BHP Billiton to include arbitration clauses in its cross border contracts:

Spanish Mountain announces commencement of pre-feasibility study

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 31, 2011) - Spanish Mountain Gold Ltd. (the "Company") (TSX VENTURE:SPA) is pleased to announce the commencement of a Pre-Feasibility Study ("PFS") for the Spanish Mountain Gold Project (the "Project"). The PFS will refine the estimates of capital and operating costs that were the basis for the Preliminary Economic Assessment (PEA) completed by the Company in December 2010. The Company currently has ongoing resource definition, geotechnical, metallurgical and power supply studies underway, the results of which will form part of the PFS.

Gem International options 100% of gold project in Mvomero & Kilindi Districts of Tanzania

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 31, 2011) - Gem International Resources Inc. (TSX VENTURE:GI) has entered into an option agreement with Mr. Anderson Fred Temu, Mr. Pascal D. Nestory and Mr. Benard Beatus (the "Optionor"), to acquire a 100-per-cent interest in the Mvomero Gold Project, located in the Mvomero and Kilindi districts of Tanzania. The project encompasses Prospecting Licenses PL7138/2011 and PL7147/2011, containing a total area of 234.75 square kilometers and is located 35 kilometers west-southwest of Canaco Resources Inc.'s Magambazi Hill Project.

Nevsun drills 30m of 8.55% copper adjacent to Bisha Mine

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 31, 2011) - Nevsun Resources Ltd. (TSX:NSU)(NYSE Amex:NSU) is pleased to report the assays from the forty-three diamond drill holes at the hanging wall copper zone within its Bisha mining license in Eritrea. The hanging wall copper zone is immediately west of the Bisha Main deposit and partially within the current open pit limit but it is not included in the current resource or reserve estimate for Bisha.