The transaction will result in a consolidated landholding of over 1,500km2 between and along a strike from the Oyu Tolgoi and Tsagaan Suvarga copper mines.
BHP wants find a way to up output for the industrial metal from its Olympic Dam by 40% even before a proposed and long-awaited mega-expansion of the operation takes place.