Australia shuts its biggest iron ore port on cyclone threat
Port Hedland handles vast volumes of iron ore from all major miners including BHP Group, Rio Tinto Group, and Fortescue.
With bucket sizes ranging from 18-35 m3 (depending on materials), it has an operating weight range of 216-220 ts (depending on configuration) and is powered by a Tier 2-compliant Komatsu SSDA16V160E-2 engine rated at 1,316 kW net. It is available in two configurations, standard boom and high lift boom.In standard boom configuration, it can load Komatsu HD1500-7 (144 t capacity) and similar-class trucks in four passes, and 730E(184 t capacity) trucks in five passes. Read more