Josephine Mining Corp. Continues Drilling Update at Turner Gold Project: Hole TJM-71 Intercepts 11.7 g/t Equiv Au Over 105 Feet and TJM-81 Intercepts 10.1 g/t Equiv Au Over 61.5 Feet

SPOKANE, WASHINGTON–(Marketwire – Sept. 29, 2011) – Josephine Mining Corp. (“JMC” or the “Company”) (TSX VENTURE:JMC) is pleased to announce a drilling update on the Turner Gold Project. The Company continues to fast track its progress with further drilling, logging and assaying at its Turner Gold Project in O’Brien, Oregon.

Significant results include: