TMAC drills more high grades at Doris North BTD Extension zone Highlights from the recent underground drill program include 196.1 g/t gold over 6.8 metres. Canadian Mining Journal Staff | October 16, 2019 | 3:44 pm
Granada hits near-surface high grades at Long Bars zone Resources at the Granada mine are 22.3 million measured and indicated tonnes grading 1.06 g/t gold for 762,000 contained oz. Canadian Mining Journal Staff | October 15, 2019 | 3:53 pm
GoldSpot tech used to create geological map at Yamana mine site GoldSpot says its technology is especially effective in areas where rock exposure is poor, making visual observations more difficult. Canadian Mining Journal Staff | October 15, 2019 | 3:47 pm
Gatling Exploration connects two deposits along trend at Larder The Larder project has a historical resource of 335,000 indicated tonnes at 4.07 g/t gold and containing 43,800 oz. Canadian Mining Journal Staff | October 15, 2019 | 3:44 pm
Omineca speeds dewatering at Wingdam project When dewatering is compete, Omineca will prepare the first underground area for ground freezing and bulk sampling will begin. Canadian Mining Journal Staff | October 15, 2019 | 3:40 pm
Tri Origin inks second agreement with De Beers The new deal is for Tri Origin’s Nipissing Cobalt project. Canadian Mining Journal Staff | October 10, 2019 | 3:21 pm
StrikePoint drills 102 g/t Au, 356 g/t Ag at Willoughby StrikePoint only acquired the Willoughby property this spring and started exploration in July. Canadian Mining Journal Staff | October 10, 2019 | 3:16 pm
Go Metals finds multiple untested zones at Monster Go Metals is planning a rotary air blast and diamond drilling program for the sites. Canadian Mining Journal Staff | October 9, 2019 | 4:50 pm
Blue Star drills 31.1 g/t over 1.0 m at Hood River The company found gold intersections in four drill holes. Canadian Mining Journal Staff | October 9, 2019 | 4:49 pm
NexGen releases new assays from Arrow drilling The highest results were 33.78% uranium oxide over 12.0 metres and 32.88% over 8.0 metres. Canadian Mining Journal Staff | October 9, 2019 | 4:48 pm
Wallbridge hits more wide intersections at Fenelon The highest grade returned was 41.19 g/t gold over 0.5 metre in a core length of 6.0 metres that assayed 3.26 g/t. Canadian Mining Journal Staff | October 9, 2019 | 4:47 pm
Agnico declares commercial production at Amaruq Proven and probable reserves at the Amaruq deposit are 24.9 million tonnes grading 3.59 g/t gold or 2.9 million contained oz. Canadian Mining Journal Staff | October 8, 2019 | 3:06 pm