Calibre Drilling intersects 19.2 metres grading 223.4 g/t Silver and 9.44 Metres Grading 488.6 g/t Silver on the Blag Gold-Silver Vein System, Eastern Borosi Project, Nicaragua
Drilling on the Main Blag Structure has intersected 5.37 metres grading 2.99 g/t gold and 31.6 g/t silver.