Description: The Works is a material ropeway system continuous monocable type with buckets for loads of 700kg. It consists of one section only and is designed to transport material at a speed of up to 4.5 metres per second at a capacity of 50 tonnes per hour downhill and 25 tonnes per hour uphill.