Highlights from the latest drilling at the deposit intersected 16 metres grading 26.5 grams gold per tonne from 233 metres, including 2 metres of 115.3 grams per tonne.
Miner started drilling at the Murdie project in South Australia, despite opposition from an Aboriginal group that says the project will damage a sacred area.