The incident happened on Sep. 8, when a pipe carrying process solution in the heap leach area was struck by a large block of ice that had rolled down the heap leach valley slope, Barrick said.
Skeena Resources Limited is pleased to announce results from the first 8 holes of its 6,000 metre drill program at the past-producing Snip high-grade gold project located in the Golden Triangle of northwest British Columbia.