Mining students learn to develop feasibility studies using high-tech solution
The Riivos-built mining financial technology software helps them spend less time building spreadsheet models and more time optimizing their mine project economics.
Index gained 9% from April to June, outperforming the S&P/TSX Composite index, which gained 6%, and the London Metal Exchange index, which gained 7% in the same period.
Second-quarter coal production at Central Appalachia's 25 top-producing mines totaled 11.63 million tons, up about 2.9% from the 11.30 million tons produced in the same quarter a year-ago.