TORONTO, ONTARIO–(Marketwire – Feb. 10, 2012) –
THIS PRESS RELEASE IS NOT FOR DISTRIBUTION IN THE UNITED STATES OR TO U.S. NEWS AGENCIES
Century Iron Mines Corp. (TSX:FER) (“Century Iron” or the “Company”) is pleased to announce Duncan Lake Iron Ore Project Phase II Drilling Update.
Phase II Drilling, Update results are being reported for 19,700m of drilling in 54 drill holes located in deposit zones 3, 4 and 6.
The Phase II drilling program is expected to continue after freeze-up in 2012, to provide information for an NI43-101 updated mineral resource estimate and to perform a Preliminary Economic Assessment (PEA), the contract for which has been awarded to Met-Chem Canada Inc.
The Phase II 19,700 drill program has improved confidence in the continuity of magnetite dominant zones and has demonstrated approximate strike extends 2.5 km in zone 3, 1.0 km in zone 4 and 1.0 km in zone 6. Sandy Chim, President & CEO of Century Iron commented: “These results continue to show grade consistency with that of previous drilling. Our program has been on plan and I am pleased that we are moving toward a target updated NI43-101 resource estimate and PEA by approximately mid-2012.”
At the end of this news release is a diagram of the Project zones 1 through 6 and three tables namely zone 3, zone 4 and zone 6 with details included of the 19,700m of drilling in 54 drill holes together with mineralized intercepts and grades, drill hole collar coordinates, hole dips and azimuths as well as intercept core lengths. More results of the continuing drilling program will be reported when assays are available.
The Qualified Person on the project, as defined under National Instrument 43-101, are Wenlong Gan, P.Geo. He was responsible for the preparation of all technical information provided in this press release and has reviewed and approved the contents of this news release.
Zone 3 – Duncan Lake Iron Ore Project Phase II Drilling, Update #I – Results
The following intercepts were defined by a 16% Fe cut off and an 8m minimum core length. True widths have yet to be determined. Drill results indicate that the geometry of folding within zone 3 is relatively complex. The reader is cautioned that true widths may vary significantly from the reported drilled core lengths.
HOLE NUMBER | NORTHING | EASTING | ELEVA- TION |
DIP | AZI- MUTH |
FROM (M) |
TO (M) |
Core Length (M) |
FE % |
DUN-11-228 | 5935588 | 323956 | 153 | -54 | 315 | 90 | 108 | 18 | 25.8 |
126 | 138 | 12 | 23.1 | ||||||
216 | 225 | 9 | 29.9 | ||||||
DUN-11-229 | 5935864 | 323960 | 165 | -52 | 315 | NSA | |||
DUN-11-232 | 5935973 | 324134 | 155 | -50 | 315 | 43.9 | 341.4 | 297.5 | 32.6 |
DUN-11-233 | 5935837 | 324273 | 153 | -50 | 316 | 45.8 | 86.4 | 40.6 | 27.7 |
DUN-11-234 | 5936376 | 324015 | 173 | -50 | 315 | 167 | 194.8 | 27.8 | 30.8 |
DUN-11-235 | 5936140 | 324252 | 163 | -50 | 315 | 138 | 210 | 72 | 24.6 |
228 | 291 | 63 | 23.8 | ||||||
294 | 318 | 24 | 18.9 | ||||||
321 | 333 | 12 | 24.6 | ||||||
336 | 501 | 165 | 29.2 | ||||||
507 | 552 | 45 | 26.7 | ||||||
555 | 567 | 12 | 27.7 | ||||||
DUN-11-236 | 5935951 | 324440 | 156 | -52 | 315 | 64.5 | 156 | 91.5 | 25.2 |
236.5 | 273 | 36.6 | 23.7 | ||||||
DUN-11-237 | 5936441 | 324232 | 178 | -50 | 315 | 42.3 | 149.8 | 107.5 | 26.4 |
209.6 | 396 | 186.4 | 27.6 | ||||||
DUN-11-238 | 5936167 | 324537 | 160 | -50 | 315 | 13.8 | 135 | 121.3 | 26.1 |
DUN-11-240 | 5936484 | 324471 | 172 | -51 | 315 | 21.9 | 35.2 | 13.3 | 28.5 |
51 | 66 | 15 | 20.1 | ||||||
86.7 | 97.8 | 11.1 | 20.3 | ||||||
399 | 493.2 | 94.2 | 24.3 | ||||||
DUN-11-242 | 5936294 | 324948 | 153 | -51 | 315 | 56 | 96 | 40 | 26.8 |
117 | 201 | 84 | 22.3 | ||||||
DUN-11-245 | 5936584 | 324938 | 151 | -53 | 315 | 159 | 168 | 9 | 23.4 |
198 | 372 | 174 | 25.4 | ||||||
DUN-11-246 | 5936359 | 325163 | 152 | -51 | 315 | 183 | 270 | 87 | 23.3 |
296 | 336 | 40 | 29.8 | ||||||
DUN-11-247 | 5937051 | 324753 | 153 | -53 | 319 | 153 | 165 | 12 | 22.4 |
309 | 384 | 75 | 24.8 | ||||||
DUN-11-248 | 5936811 | 325010 | 151 | -52 | 316 | 78 | 87 | 9 | 24.7 |
114 | 123 | 9 | 22.9 | ||||||
DUN-11-251 | 5937229 | 324859 | 154 | -52 | 314 | 324 | 387.3 | 63.3 | 23.1 |
DUN-11-252 | 5936706 | 325394 | 149 | -51 | 315 | 24.6 | 63 | 38.4 | 30.2 |
78 | 99 | 21 | 33.7 | ||||||
DUN-11-255 | 5936802 | 325566 | 155 | -50 | 320 | NSA | |||
DUN-11-256 | 5936583 | 325784 | 147 | -52 | 315 | 75 | 88 | 13 | 26.2 |
DUN-11-259 | 5937585 | 325069 | 164 | -50 | 315 | 294 | 330 | 36 | 23.5 |
DUN-11-260 | 5937105 | 325545 | 165 | -51 | 315 | 5.5 | 48 | 42.5 | 28.9 |
DUN-11-261 | 5936957 | 325695 | 155 | -52 | 312 | 112 | 253 | 141 | 25.8 |
357 | 375 | 18 | 19.2 | ||||||
DUN-11-263 | 5937104 | 325830 | 163 | -50 | 315 | NSA | |||
DUN-11-334 | 5935541 | 324001 | 153 | -54 | 308 | 146 | 165 | 19 | 31 |
186 | 195 | 9 | 18.9 | ||||||
356 | 364 | 8 | 20.5 | ||||||
DUN-11-340 | 5936264 | 324126 | 172 | -43 | 320 | 162.8 | 174.4 | 11.6 | 36.3 |
304 | 375 | 71 | 31.9 | ||||||
DUN-11-343 | 5936318 | 324357 | 169 | -50 | 315 | 173.5 | 197.4 | 23.9 | 22.5 |
211.9 | 263.5 | 51.7 | 25.8 | ||||||
279.1 | 320.1 | 41 | 23.7 | ||||||
340.8 | 355.4 | 14.7 | 21.5 | ||||||
366.3 | 492.4 | 126.2 | 23.8 | ||||||
505.7 | 620.8 | 115.1 | 23.6 | ||||||
DUN-11-345 | 5936626 | 324332 | 176 | -47 | 312 | 43.9 | 140.8 | 96.9 | 24.4 |
167.9 | 248.5 | 80.7 | 20.7 | ||||||
263.1 | 436 | 172.9 | 22.9 | ||||||
447.6 | 456.3 | 8.7 | 17.8 | ||||||
DUN-11-351 | 5936219 | 325024 | 155 | -49 | 313 | 129 | 204 | 75 | 21.2 |
231 | 291 | 60 | 24 | ||||||
DUN-11-360 | 5937413 | 324956 | 159 | -50 | 314 | 290.1 | 339 | 48.9 | 21.4 |
DUN-11-362 | 5936513 | 325857 | 148 | -51 | 315 | 6 | 42 | 36 | 22.5 |
DUN-11-364 | 5937675 | 324982 | 161 | -51 | 315 | 171 | 183 | 12 | 25.2 |
DUN-11-367 | 5937891 | 324910 | 163 | -51 | 315 | 6 | 30 | 24 | 22.4 |
DUN-11-368 | 5937177 | 325754 | 160 | -52 | 315 | NSA | |||
(NSA – No Significant Assays) |
Zone 4 – Duncan Lake Iron Ore Project Phase II Drilling, Update # I – Results
The following intercepts were defined by a 16% Fe cut off and an 8m minimum core length. True widths have yet to be determined. Drill results indicate that the geometry of zone 4 is controlled by a thrust fault, which hinders the accurate interpretation of the true width of the mineralized intersections. The reader is cautioned that true widths may vary significantly from the reported drilled core lengths.
HOLE NUMBER | NORTHING | EASTING | ELEVA- TION |
DIP | AZI- MUTH |
FROM (M) |
TO (M) |
Core Length (M) |
FE % |
DUN-11-212 | 5941639 | 329388 | 149 | -67 | 320 | 38 | 286 | 248 | 25.5 |
345.6 | 444.3 | 96.5 | 22.4 | ||||||
DUN-11-213 | 5941589 | 329428 | 147 | -51 | 320 | 105.85 | 298 | 192.1 | 24.2 |
302 | 330.3 | 28.4 | 24 | ||||||
DUN-11-214 | 5941795 | 329520 | 152 | -60 | 320 | 56.8 | 73.6 | 16.8 | 25.8 |
89.7 | 191.5 | 101.8 | 25.6 | ||||||
210.3 | 230.2 | 19.9 | 22.7 | ||||||
296.5 | 397.6 | 101.1 | 21.5 | ||||||
450.4 | 459.6 | 9.2 | 21.9 | ||||||
DUN-11-215 | 5941985 | 329361 | 156 | -61 | 320 | 14.7 | 130.7 | 116 | 21.1 |
DUN-11-216 | 5942086 | 329525 | 156 | -61 | 320 | 37.8 | 48.6 | 10.8 | 19.1 |
65.5 | 91.6 | 26.1 | 19.2 | ||||||
DUN-11-217 | 5941911 | 329684 | 149 | -61 | 320 | 106.5 | 116.2 | 9.7 | 20.9 |
122.3 | 234 | 111.7 | 25.8 | ||||||
DUN-11-218 | 5942138 | 329751 | 148 | -61 | 320 | 28.1 | 46.6 | 18.5 | 18.4 |
72.4 | 84.3 | 11.9 | 24.4 | ||||||
90.4 | 103.7 | 13.3 | 17.5 | ||||||
DUN-11-219 | 5942043 | 329834 | 147 | -64 | 320 | 60 | 187.6 | 127.6 | 23.3 |
221.3 | 240 | 18.7 | 22.2 | ||||||
DUN-11-221 | 5942076 | 330067 | 143 | -62 | 320 | 155.8 | 241 | 85.2 | 27 |
259.4 | 270 | 10.6 | 23.8 | ||||||
DUN-11-222 | 5942143 | 330267 | 144 | -61 | 320 | 187.1 | 200.5 | 13.4 | 20.8 |
219.4 | 227.5 | 8.1 | 22.3 | ||||||
238.1 | 265.4 | 27.3 | 18.3 | ||||||
DUN-11-223 | 5942306 | 330394 | 144 | -61 | 320 | 133 | 143.5 | 10.5 | 25.9 |
DUN-11-224 | 5942451 | 330535 | 145 | -61 | 320 | 83.2 | 97.7 | 14.5 | 27.1 |
DUN-11-320 | 5941932 | 329399 | 156 | -60 | 320 | 8.6 | 17.5 | 8.9 | 18.7 |
91.9 | 206.3 | 114.4 | 23.5 | ||||||
DUN-11-321 | 5941838 | 329483 | 152 | -60 | 320 | 16.9 | 165.8 | 148.9 | 22.4 |
231.2 | 337.6 | 106.4 | 22.3 | ||||||
375.5 | 391.6 | 16.2 | 18.4 | ||||||
DUN-11-331 | 5942393 | 330584 | 146 | -62 | 320 | 188 | 203.4 | 15.4 | 28.5 |
DUN-11-332 | 5942593 | 330667 | 146 | -54 | 320 | NSA | |||
(NSA – No Significant Assays) |
Zone 6 – Duncan Lake Iron Ore Project Phase II Drilling, Update # I – Results
The following intercepts were defined by a 16% Fe cut off and an 8m minimum core length. True widths have yet to be determined. Zone 6 is intruded by an irregular network of granitic intrusives which hinder the estimation of true width. The reader is cautioned that true widths may vary significantly from the reported drilled core lengths.
HOLE NUMBER | NORTHING | EASTING | ELEVA- TION |
DIP | AZI- MUTH |
FROM (M) |
TO (M) |
Core Length (M) |
FE % |
DUN-11-272 | 5936321 | 326757 | 154 | -51 | 340 | 16.2 | 65.2 | 49 | 23.2 |
118.2 | 127.3 | 9.1 | 24.1 | ||||||
173.4 | 196.5 | 23.1 | 24.5 | ||||||
312.3 | 321.2 | 8.9 | 22.3 | ||||||
DUN-11-273 | 5936163 | 326814 | 156 | -52 | 340 | 4.8 | 42.4 | 37.6 | 30.5 |
273.7 | 346.6 | 72.9 | 31.2 | ||||||
366.3 | 384.5 | 18.2 | 23.3 | ||||||
450.7 | 466.5 | 15.8 | 21.9 | ||||||
DUN-11-383 | 5936395 | 327263 | 153 | -52 | 340 | 146.2 | 224.8 | 78.6 | 20.1 |
236.8 | 245.3 | 8.5 | 27.8 | ||||||
DUN-11-384 | 5936545 | 327313 | 152 | -52 | 340 | 9.5 | 45.5 | 36 | 19.3 |
115.8 | 127.9 | 12.1 | 32.9 | ||||||
DUN-11-386 | 5936641 | 327492 | 152 | -50 | 340 | 8 | 34.8 | 26.8 | 19.2 |
64.1 | 156 | 91.9 | 25.7 |
To view the map associated with this press release, please visit the following link:http://media3.marketwire.com/docs/765219_map.pdf
About the Duncan Lake Property
The Duncan Lake Iron Ore Property (“DLIOP”) is located approximately 570 km north of Mattagami, Québec, and can be easily accessed via paved road (Highway 109), connecting Mattagami to Radisson. Road distance from Montreal to DLIOP is estimated to be 1,350 km. The property is located 50 km south of Radisson and 10 km south of the LG2 regional airport.
The property is subdivided into six (6) separate mineralized zones (1 to 6) proximal to Highway 109. The claim blocks 1, 2, and 5 are located southwest of the highway and claim blocks 3, 4 and 6 to the northeast. The property has recently been expanded to 528 exploration claims covering 25,448.8 hectares.
The DLIOP is subject to a joint venture agreement between Century, which holds a 51% interest, and Augyva Mining Resources Inc.(‘Augyva’), which holds a 49% interest under an option and joint venture agreement dated May 20, 2008.
On November 11, 2010, Century completed its funding of $6,000,000 to earn an initial 51% interest in the DLIOP in accordance with the JV Agreement. Pursuant to the JV Agreement, and after earning the initial 51% interest, Century will have the option to increase its interest in the property to 65% by expending a further $14 million during the following 4 years thereafter.
About the Company
Century Iron Mines Corporation (TSX:FER) is Canada’s largest holder of iron ore land claims, with interests in several properties in the Provinces of Quebec and Newfoundland and Labrador. Century’s mission is to enhance shareholder value through the development of iron ore projects in Canada and to become a major Canadian iron ore producer. Century has promising iron ore assets and is firmly entrenched in western Quebec and in the prolific iron ore-producing region of the Labrador Trough in eastern Quebec and western Labrador. The Company has two key strategic partners in WISCO International Resources Development & Investment Limited and Minmetals Exploration & Development (Luxembourg) Limited S.àr.l., both state-owned Chinese companies with the financial and technical resources to assist the Company with funding and technical expertise for the exploration and development of its iron ore projects.
The Company has interests in the following mineral exploration projects located in Quebec and Newfoundland and Labrador:
The Company’s objective is to enhance shareholder value through the development of iron ore projects in Canada and to become a Canadian iron ore producer. Century Iron’s website is: www.centuryiron.com.
About WISCO
WISCO International Resources Development & Investment Limited holds an approximate 25% interest in Century Iron and an off-take agreement for up to 60% of the production. WISCO is one of the major subsidiaries of Wuhan Iron & Steel (Group) Corporation (“WISCO Group”), headquartered in Wuhan in the province of Hubei in the People’s Republic of China. The WISCO Group is one of the “Big Three” Chinese state-owned integrated iron and steel company. In 2010, the WISCO Group had an annual output of 36 million tonnes of steel. The WISCO Group’s portfolio of business activities includes mining, coking, sintering, iron making, steel making, rolling and associated utilities.
About Minmetals
Minmetals Exploration & Development (Luxembourg) Limited S. àr. l holds an approximate 5% interest in Century Iron and off-take agreement for up to 10% of the production. Minmetals is one of the major subsidiaries of China Minmetals Corporation (“China Minmetals”). China Minmetals is a state-owned diversified metals and mining company based in Beijing, in the People’s Republic of China. China Minmetals is engaged in the production and trading of metals and minerals, including copper, aluminum, tungsten, tin, antimony, lead, zinc, iron and steel-related commodities. China Minmetals also engages in activities related to real estate development, finance, shipping and tendering.
Forward Looking Information
This press release contains forward-looking statements and information that are based on the beliefs of management and reflect the Company’s current expectations. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release includes information relating to the expected completion of the current drilling phase at Duncan Lake and the Company’s objective to enhance shareholder value through the development of iron ore projects in Canada and to become a major Canadian iron ore producer. The forward-looking information is based on certain assumptions, which could change materially in the future, including the assumption that the Company is able to complete the current phase III an extension to the Phase II drilling program and that the development of the Company’s iron ore projects will enhance shareholder value and be sufficient for it to become a major Canadian iron ore producer. Such statements and information reflect the current view of the Company with respect to risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the risk that the current phase III an extension to the Phase II drilling program at Duncan Lake may be delayed or may not be completed and that the Company’s Canadian iron ore projects may not succeed in enhancing shareholder value or allow the Company to become a major Canadian iron ore producer. The Company cautions that the foregoing list of material factors is not exhaustive. When relying on the Company’s forward-looking statements and information to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. The Company has assumed a certain progression, which may not be realized. It has also assumed that the material factors referred to above will not cause such forward-looking statements and information to differ materially from actual results or events. However, the list of these factors is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors.
THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS PRESS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.
CHF Investor Relations
Robin Cook
Senior Account Manager
416-868-1079 Ext. 228
[email protected]