London-based consultancy Minviro says the true climate change impacts of producing battery-grade graphite can be as much as 10 times higher than published values.
Ivanhoe says DRC mine's first 3.8mtpa concentrator is now fully operational and pre-production ore stockpiles reach 3.4m tonnes grading average 4.78% copper.