After restarting mining at the end of July and milling in early August, following a temporary shutdown, the operation generated 3,200 gold oz. last month.
The early-stage study defined a 15-year, 11,000 t/d open pit operation, mining the Marban, Norlartic, Kierens, North-North and Gold Hawk deposits in Quebec.
Measured and indicated resources at Getchell consist of 21 million tonnes, at 2.16 g/t gold for 1.5 million gold oz., with an additional 2.8 million inferred tonnes at 7.23 g/t gold for 646,000 oz. gold.