The drillhole returned 21.1 metres of 6.89 g/t gold, which includes higher-grade intercepts, such as 2 metres of 4.81 g/t gold, and 11.8 metres of 11.32 g/t gold.
Company has released the second batch of sample results from the initial surface exploration program at its wholly owned Freeman Creek gold project in Idaho.
The drill highlights include 17.5 metres of 2.52% lead and 11.53% zinc starting at 28.5 metres; 3 metres of 0.61% lead and 8.45% zinc from 53.5 metres.
An updated resource estimate for the gold project features two open pit deposits, with a total of 21.3 million indicated tonnes grading 1.13 g/t gold, and 47.1 million inferred tonnes at 0.98 g/t gold.