SilverCrest releases high-return feasibility for Las Chispas, gives construction go-ahead With the feasibility release, SilverCrest’s board has formally approved construction of the 1,250 t/d mine. Canadian Mining Journal Staff | February 3, 2021 | 12:13 pm
BMT releases Flight Enabled Detector 2.0 Equipment features an automated flight control and customizable flight plan. Canadian Mining Journal Staff | February 2, 2021 | 10:11 am
Osisko Development drills 8.4 metres of 8.43 g/t gold at Cariboo Drill highlights from Valley zone include 8.4 metres of 8.43 g/t gold, including 0.5 metres of 84.5 g/t gold Canadian Mining Journal Staff | February 2, 2021 | 10:06 am
Laurentian starts court proceeding for formal restructuring under CCAA The first phase of the restructuring is expected to take three months, and is anticipated to result in a new framework for the institution. Canadian Mining Journal Staff | February 2, 2021 | 8:49 am
Treasury tables PEA on expanded gold project at Goliath Early-stage study suggests a 5,000 t/d combined open pit and underground operation, mining the Goliath, Goldlund and Miller deposits in Ontario. Canadian Mining Journal Staff | February 2, 2021 | 6:57 am
Mayhew Performance to distribute ABI Disconnect BEV safety system in Canada Company and G&L Innovation have announced a partnership for the exclusive distribution rights for Canada, Chile, Peru, Argentina, and Brazil for G&L’s ABI (Automatic Battery Interrupter) Disconnect system. Canadian Mining Journal Staff | February 1, 2021 | 12:36 pm
Sandvik introduces the Toro LH410 loader Company and Rock Technology have introduced the transformed Toro LH410 underground loader, with a payload capacity of 10 tonnes. Canadian Mining Journal Staff | February 1, 2021 | 12:34 pm
Maritime discovers new gold-silver zone at Hammerdown Highlights from infill drilling include 92.1 metres of 1.4 g/t gold and 15.5 metres of 1.4 g/t gold. Canadian Mining Journal Staff | February 1, 2021 | 12:31 pm
Probe drills high gold grades within Courvan trend at Val-d’Or East These latest results will be incorporated into an upcoming resource estimate for the property, expected this year. Canadian Mining Journal Staff | February 1, 2021 | 9:29 am
Karora cuts 9 metres of 19 g/t gold at Larkin discovery at Beta Hunt The company, which is about halfway through a 6,100-metre drill program at Larkin, hopes to define a resource at the zone this year. Canadian Mining Journal Staff | February 1, 2021 | 5:20 am