The company cut 13.05% copper over 22.25 metres from 219 metres downhole at a 2% copper cut off grade in a deposit that begins 190 metres below surface. At a 5% copper cut off grade, the intersection cut 15.92% copper over 17 metres and at a 1% copper cut off grade it cut 10.29% copper over 29 metres.
Ivanhoe drilled that hole 18 km north of the Kamoa-Kakula’s planned initial mine at its Kakula deposit.
Comments
Ganapathy Ramachandran
Is it feasible for mining point of view. Mining below 200 meters depth from surface requires lot of Geo technical information.