Brazil’s Gerdau buys out Sumitomo Corp and JSW in Gerdau Summit
The transaction is expected to close in early 2025.
After three days of carefully navigating through a shattered reactor building, the Manbo finally reached the heavily damaged Unit 3 reactor. There, the robot beamed back video of a gaping hole at the bottom of the reactor and, on the floor beneath it, clumps of what looked like solidified lava: the first images ever taken of the plant’s melted uranium fuel.