Sepro Mineral Systems Corp. was pleased to work in partnership with Pretium Resources Inc. on the design and supply of a single, customized modular LECO Laboratory designed for rapid sulfur determination. The 40 foot container will meet the analytical and performance requirements during earthworks of the high-grade gold Brucejack Project located 65km north of Stewart in Northern British Columbia, Canada.
Through the expertise within the Sepro Group, we are able to combine in-depth experience in the design, engineering and construction of mineral processing and plant systems with technical expertise in geochemical assay laboratory services. As a result of this collaborative approach, Sepro can provide a cost effective modular solution while ensuring the most current technical methodologies and stringent quality standards are met.
Following the initial delivery of the single 40 foot lab container to the Brucejack Project completed in mid-August, a 7 unit Development Assay Laboratory (DAL) is scheduled to be in production in the fall of 2015. The DAL will have a range of analytical capabilities, providing quick turnaround times for fire assay and trace metal analysis.
Stay tuned for future updates on the mobile assay lab and 7 unit DAL later this year.
The Sepro Group is committed to presenting customers with expert mineral processing recommendations in order to guide them to success in their gold recovery and post-mining operations.
You can connect with one of our representatives today to discuss engineering solutions for your specific requirements via our contact page.
Posted by Dev Saini