Vale resumes operations at Salobo 3 after fire
Vale reiterates that the 2024 copper production guidance remains at 320-355 kt.
VANCOUVER — WARDROP ENGINEERING has been awarded the detailed engineering design and procurement contract for TERRANE METALS’ Mt. Milligan copper-gold project 155 km northwest of Prince George, B.C. Wardrop recently completed the feasibility study for the project that involves a conventional truck-and-shovel open pit mine and 60,000 t/d copper concentrator…more at CAMESE