TORONTO, ONTARIO–(Marketwire – Oct. 16, 2012) – Pele Mountain Resources Inc. (TSX VENTURE:GEM)(OTCQX:GOLDF) (“Pele” or the “Company“) today announced the arrival of two drill rigs and the commencement of a 6,500-metre drill program at its Eco Ridge Mine Rare Earths and Uranium Project at Elliot Lake, Ontario. Pele has completed a positive Preliminary Economic Assessment (“PEA“) for Eco Ridge that demonstrates its potential to become a profitable producer of rare earth oxides (“REO“) and uranium oxide (“U3O8“).
The program will include step out drilling to the northwest and west of the existing Resource Wireframe with an objective of adding up to 20-million tonnes of Inferred Resources. The program is targeting areas where historical drilling was wide-spaced with corresponding drill logs indicating that every hole successfully intersected the Main Conglomerate Bed (“MCB“). The historical drill core, however, was not assayed for rare earths.
Al Shefsky, President and CEO of Pele stated, “Our goal in adding resources at Eco Ridge is to extend the mine life in order to improve project economics. We have also worked diligently for several months to optimize the processing circuit and we expect to provide updates on our progress in the coming weeks.”
The mineral resources at Eco Ridge have excellent potential for upgrade and expansion, with lower-than-normal exploration risk in the historically drilled areas. The mineralized reefs of Elliot Lake are well known for their vast size and consistency. To-date, infill drilling at Eco Ridge has been 100-percent successful in upgrading Inferred resources to the Indicated category in the MCB. There is also excellent potential to add new resources in areas beyond the Resource Wireframe where the deposit remains open down dip beyond the historically drilled areas.
Mineral resources for the main conglomerate bed at Eco Ridge were estimated by Roscoe Postle Associates (as of April 16, 2012), as summarized in the table below.
Mineral Resource Estimate for the Main Conglomerate Bed at Eco Ridge
Zone & Classification | Tonnes | U3O8 | U3O8 | LREO6 | HREO7 | TREO | TREO | |
(‘000s) | (%) | (‘000 lbs) | (ppm) | (ppm) | (ppm) | (‘000 lbs) | ||
Indicated | ||||||||
MCB | 20,514 | 0.045 | 20,447 | 1,426 | 193 | 1,618 | 73,184 | |
Inferred | ||||||||
MCB | 16,906 | 0.043 | 15,940 | 1,279 | 183 | 1,463 | 54,515 |
Notes:
About Pele
Pele Mountain Resources is exploring and developing rare earth projects in the only two North American mining camps to ever achieve significant commercial rare earth production from hard rock mining: Mountain Pass, California and Elliot Lake, Ontario. Mountain Pass is North America’s premier rare earth mining camp and Elliot Lake was once the major source of heavy rare earth, yttrium and uranium production in North America. Both locations offer compelling competitive advantages compared to other emerging rare earth development projects, including extensive existing regional infrastructure, favourable mineralogy and metallurgy, and political stability. Pele’s shares are listed on the TSX Venture Exchange under the symbol “GEM” and on the OTCQX under the symbol “GOLDF”.
Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe Pele’s future plans, objectives or goals, including words to the effect that Pele or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements. The economic viability of the NI 43-101 mineral resources at Pele’s Elliot Lake Project has not yet been demonstrated by a preliminary feasibility study.
Shares Outstanding: 153,151,246
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.