Rio Tinto names Shell’s Katie Jackson as new copper chief
Jackson, who is the current president of National Grid Ventures, an energy group, joins Rio Tinto on September 1.
allmineral has been awarded three independent contracts to supply its mineral processing products and equipment to the Rio Tinto Low Grade Iron Ore Pilot Plant. The pilot plant, which will be located at the Brockman 4 mine site in Western Australia,60km north west of Tom Price, will play a strategic part in the optimisation of beneficiation options for future Pilbara lower grade deposits.