Wits Gold completes positive scoping study on the DBM gold project

Wits Gold completed shallow underground mine design comprising a 700 metre vertical shaft for men and materials and a conveyor decline for rock transport. Based on indicated resources of 34.5Mt at 5.3g/t Au (5.9Moz), the same reefs host indicated resources of 17.0Mt at 0.16kg/t U3O8 (6.1Mlb)