Galp drops plans to build Aurora lithium refinery in Portugal
Galp was left alone in early 2024, when Northvolt said it would not invest in the 50-50 joint venture set up in November 2021.
TNG Limited reported positive interim results from the Pre-Feasibility Study (“PFS”) on its 100%-owned Mount Peake Iron-Vanadium Project in the Northern Territory, Australia.