BHP posts second straight year of record iron ore production, beats estimates
The world's largest listed miner said iron ore output from Western Australia on a 100% basis was 76.8 million tonnes in the three months to June 30.
MDM Engineering has been awarded the EPCM contract for the engineering and construction of a 1.2 Mt/y Dense Media Separation (DMS) plant for Comide, a subsidiary of Camrose Resources, which itself is a joint venture between ENRC and Cerida. This plant is the first of two DMS units to be built on site which, when completed, will have an annual output of 3 Mt/y. (more…)