Solar, EVs and a big exit from coal: 2024’s good climate news
Solar capacity around the world was rolled out at a record pace, as bargain panel prices helped countries deploy cleaner energy.
Gebr. Pfeiffer will be providing the MPS 200 BK mill and related engineering services for Calgon Carbon Corporation’s Pearl River Plant in Bay St. Louis, Mississippi.
The mill will be installed in the spring of 2012 during the plant’s annual shutdown. The new MPS 200 BK mill will be erected adjacent to the existing mill and, during the shutdown, swapped out in order to reuse the existing mill’s foundation.