Rio Tinto ready to build Simandou after almost 30 years of setbacks
Simandou has faced delays due to legal disputes, political changes, and the challenges of building a 600 km rail and port infrastructure.
Haranga Resources Limited (ASX: HAR) has completed a magnetic survey at the Sumber iron ore project located in Mongolia, less than 50km from the Chinese border crossing at Hangi Mandal. The survey reveals that the three distinct iron outcrop zones