Video: Gold mining faces a cliff after 2025, CRU analyst predicts
Global gold production will peak at about 3,250 tonnes (105 million oz.) next year, according to CRU's Oliver Blagden.
Gebr. Pfeiffer will be providing the MPS 200 BK mill and related engineering services for Calgon Carbon Corporation’s Pearl River Plant in Bay St. Louis, Mississippi.
The mill will be installed in the spring of 2012 during the plant’s annual shutdown. The new MPS 200 BK mill will be erected adjacent to the existing mill and, during the shutdown, swapped out in order to reuse the existing mill’s foundation.