Pure Gold Mining releases feasibility on Madsen in Red Lake

With significant mining, milling and tailings infrastructure already in place, pre-production capital costs for Pure Gold Mining’s (TSXV: PGM) Madsen project in Red Lake should not exceed $94.7 million, including a 9% contingency, a feasibility study reports. Total life of mine...